Feature Estimation

After several months of Scrum we've come to a consensus on our user story point estimation which is well summed up in this article about PivotalTracker:

Point Estimate Guidelines

  • 1 or 2 points for typos or minor visual changes.
  • 3 or 5 points for concrete features.
  • 8 points for epics or "this is too big and needs to be broken down more".

 

Here's a link to the article: http://www.agileweboperations.com/how-to-estimate-user-stories-when-using-pivotaltracker 

Add comment

  Country flag

biuquote
  • Comment
  • Preview
Loading

Month List

Page List